System Drawing of Wind/ Solar Hybrid With Diesel System
In the days without wind and solar, the electric energy output from wind generator and solar panel is insufficient for the battery charging, then the battery banks shall be under voltage, our controller will automatically switch to diesel generator to supply power for the AC load.
Wind power generator Products description
Item
|
FX-1000
|
FX-2000
|
FX-3000
|
Started wind speed (m/s)
|
2 m/s
|
2 m/s
|
2m/s
|
Cut-in wind speed (m/s)
|
3 m/s
|
3 m/s
|
3m/s
|
Rated Wind speed (m/s)
|
10 m/s
|
10 m/s
|
10m/s
|
Rated voltage(AC)
|
12/24/48V
|
24/48/96/120V
|
48v/96v/120v/220v
|
Rated power(W)
|
1000W
|
2000W
|
3000w
|
Max power(W)
|
1050W
|
2010W
|
3020w
|
Rotor Diameter of Blades(m)
|
0.95m
|
1.1m
|
1.6m
|
Product assembly weight (Kg)
|
<35Kg
|
<45Kg
|
<90kg(CBM 190KG)
|
Blades height(m)
|
1.32m
|
1.64m
|
1.92M
|
Safe wind speed (m/s)
|
≤40m/s,
|
<40M/S
|
|
Blades quantity
|
3
|
3
|
|
Blade material
|
glass/basalt
|
Fiber glass
|
|
Generator
|
Three phase permanent magnet suspension motor
|
Three phase permanent magnet suspension motor
|
|
Mount Height(m)
|
2~12m
|
3-15m
|
|
Generator protection grade
|
IP54
|
IP54
|
|
Work environment temperature
|
-25~+45ºC,
|
-25~+45ºC,
|
Installation tips for Wind turbines
Wind turbines are a promising source of renewable energy. However, installing them can be a complicated process. Here are a few tips to help ensure successful installation of a wind turbine.
1. Site selection:
The ideal location for a wind turbine is an open area with constant wind flow. It is important to take into account factors such as surrounding terrain, proximity to overhead power lines, and zoning regulations. Consult with an expert to determine the best location for your wind turbine.
2. Foundation:
The foundation is a crucial component of the wind turbine. A strong foundation will ensure that your wind turbine is stable and secure. The type of foundation required will depend on the location and size of the turbine. Consult with a professional to ensure the proper foundation is installed.
3. Tower installation:
Wind turbine towers need to be installed upright and secured to the foundation. The installation of the tower should be done carefully to ensure stability and safety. Always follow the manufacturer’s instructions and consult with an expert for guidance.
4. Wiring:
Wiring the turbine to the grid is an important step. This should be done by a licensed professional and in compliance with local regulations and safety codes. Proper wiring will ensure that the electricity generated by the turbine is safely transferred to the grid.
5. Maintenance:
Maintenance of the wind turbine is essential to ensure its optimal performance. Regular inspections and cleaning of the blades, hub, and tower are crucial. Consult with the manufacturer for specific maintenance instructions and schedule routine maintenance visits with a professional.
In summary, installing a wind turbine can be complex and requires specialized knowledge and expertise.