Project Overview
project type
Ecological restoration + large ground power stations
project's venue
East Five Molecule Iron Ore Mine, Wulat Front Banner, Bayannur City, Inner Mongolia Autonomous Region
Project capacity
20MW
Average annual power generation
28.76 million kW-h
product type
350W high efficiency monocrystalline modules
Integrated Mine Management PV Project
The project utilizes photovoltaic (PV) cells to convert solar energy into electrical energy. The PV cells are encased in a solar panel and are arranged in a way that maximizes energy conversion. The project's technical highlight lies in the integration of PV cells with other technological components to create an integrated energy generation and management system.
The first technical highlight of the project is its groundbreaking power generation system. The PV-based energy system produces clean electricity without releasing greenhouse gases or hazardous toxins into the environment. The project uses an efficient solar tracking system to capture the maximum amount of sunlight and optimize its efficiency.
The second technical highlight is the installation of a high-voltage DC transmission system. The system optimizes solar energy transmission to minimize power loss, making it more efficient and effective. The DC transmission system is equipped with a central inverter that enables smooth and steady AC power delivery while minimizing the loss of electricity during transmission.
The third technical feature is the installation of a battery storage system. The storage system optimizes the management of energy captured by the PV cells by storing excess energy produced during peak periods and releasing it when there is a power demand. The storage system ensures that the project can provide a stable and continuous supply of electricity irrespective of fluctuating weather conditions or periods of low solar energy capture.